Jeff brought home laminate tile for the bathroom. We are hoping to get the bathroom done while Jeff is home this week. The girls have the walls painted and the cabinets done. Joy is working on the hardware. We decided we need to strip the door and door jamb and repaint that. The stuff that needs done while Jeff is here is the floor and the trim around the top. The other stuff can be done by me and the girls. The hardest part is going to be putting the tile under the claw foot tub. I think we can jack the tub up and slip the laminate tile under since its not grouted and such.
Jeff already installed new lights in the bathroom. Oh yeah, I need him to take the stool out so we can paint behind there. I already bought a new wax seal to reinstall the toilet.
No comments:
Post a Comment